
Full Tear-Off & Replacement
Roof Replacement in Colorado Springs — Most Done in a Single Day.
Complete tear-off, deck inspection, code-current underlayment, premium shingles. Lifetime workmanship warranty included.
Roof Replacement done the right way.
A real roof replacement is more than new shingles. It's a tear-off down to the deck, a full inspection of every sheet of plywood, ice-and-water shield where it matters (not just where code requires), drip edge, starter strip, ridge venting, and a manufacturer-certified install. Cheap roofers skip half of that. We don't.
What you get
- Complete tear-off down to the deck
- Deck inspection — rotten plywood replaced before shingles go on
- Ice & water shield 6 ft from eaves (not the 2 ft code minimum)
- Synthetic underlayment + drip edge + ridge venting standard
- GAF Golden Pledge / Atlas Signature / Malarkey Emerald Pro warranty options
Our Process
How a roof replacement project runs.
Pre-job inspection
We confirm scope, walk the property for landscaping protection, and stage materials.
Tear-off day
Old roof removed, deck inspected, rotten plywood replaced, underlayment installed.
Install day
Shingles, flashing, vents, ridge cap. Most homes finished by sundown of day 2.
Magnet sweep + final walkthrough
Jobsite cleaned, magnets run twice across the yard and driveway, you sign off.
Warranty registration
Manufacturer + workmanship warranties filed in your name.
Backed in writing.
Lifetime workmanship + transferable manufacturer warranty (up to 50 years on GAF Golden Pledge). Includes wind, algae, and material defect coverage.
Why Colorado Springs homeowners pick Jax.
- Master Elite + Platinum + Emerald Pro — top tier with three major manufacturers
- Class 4 impact-resistant upgrade options for hail belt homes
- HOA color and material approval handled for you
- Direct insurance billing on storm-related replacements
FAQ
Questions Colorado Springs homeowners ask about roof replacement.
- How long does a roof replacement take?
- Most asphalt replacements are completed in 1–2 days. Tile, metal, and complex roofs take 3–5 days.
- Will my landscaping survive?
- We tarp landscaping, set up plywood paths for the dumpster and equipment, and magnet-sweep the yard twice when finished.
- Can I stay home during the install?
- Yes — most homeowners stay home. It's loud for the morning of tear-off, then settles down.
Related services & resources
Ready to talk about your roof replacement project?
Fixed-price quote within 24 hours.
